Artomatic installation is underway. At present, the walls are painted, lights installed and a portion of the work hung. We feel optimistic that the final installation will be great.
To give a sense of where the installation is going, please take a look at the image below. The image was created in Microsoft Excel and the three of us have passed it back and forth several times to tweak our plans. We’ve removed all the text so as to not give everything away, but this is roughly what the installation should look like once completed. We target this weekend for being done with it all.
The opening reception is scheduled for Friday, May 29. All three of us will be present. Hope to see you then!